We understand the home-building process can be a little scary if you’ve never built a brand new home before, or in some cases, if you have. Ivey Homes is a process-driven company taking many of the unknowns out of buying or building new. Our team works hard to make sure that the steps are communicated fully and often. Here are a few of the steps you can expect while building your brand new Ivey home.

    11 Steps to Home Ownership

    • HOMEOWNER STEP
    • LENDER STEP
    • IVEY HOMES STEP
    Design Selection
    STEP1

    Design Selection

    You will meet with our in-house design consultant to choose your colors and verify the selections you made at the time of the contract. Our design consultant will also verify with you any outside appointments required. For example, we use Southern Lighting for our lighting selections. They have the largest selection in Augusta. While you’re making your selections we will be obtaining permits and securing construction financing.

      A Proper Foundation
      STEP2

      A Proper Foundation

      The first stage of construction is prepping the homesite and getting it ready to build on. Once the site is ready and permits are back, it is time to get the foundation or slab in. While we strive to get this done as quickly as possible, it is highly dependent on weather and permitting agencies.

        Framing
        STEP3

        Framing

        Framing will take 2 to 10 days depending on the size and complexity of the home. It is important to stay off the construction site and out of the house at this phase for safety considerations.

          Rough-Ins
          STEP4

          Rough-Ins

          Once the framing is complete we do a framing checklist and make sure the home is ready for plumbing, HVAC, and electrical rough-ins. Essentially all the stuff behind the walls. When the rough-ins are complete, the home is inspected once more before insulation and sheetrock are installed.

            Carpentry
            STEP5

            Carpentry

            After hanging and sanding of the sheetrock is finished, cabinets will be set, and the trim carpenter will set all doors and trim the house to specifications.

              Painting
              STEP6

              Painting

              It really looks like a home now, so let’s get some paint on the walls. Around this time we like to get the driveway poured as well.

                Plumbing & HVAC
                STEP7

                Plumbing & HVAC

                Now the plumber, HVAC, and electrical contractors are back to finish up. Plumbing will be installed, HVAC equipment and appliances will get installed, lights will be hanged and switches and outlets installed.

                  Flooring
                  STEP8

                  Flooring

                  Some flooring will be installed before the items in the last step are done, and some will be installed after depending on your selections.

                    Quality Control
                    STEP9

                    Quality Control

                    The home is close to complete, but we will now go through the home and make our quality control list to get it move-in ready.

                      Completion
                      STEP10

                      Completion

                      Once we get the home complete we will conduct our H.O.O.T with you. That is our Home Owner Orientation Tour. Your Builder will walk you through the home and review all systems with you and list any items that you would like addressed.

                        MOVE IN!
                        STEP11

                        MOVE IN!

                        Your home is now ready to be closed and is ready for you to move-in.